A delivery take-over survey is performed on the day, or in the hours around, a ship's transfer from seller to buyer. For second-hand tonnage, the contract is usually a Saleform memorandum of agreement, and delivery takes place at an agreed port or anchorage with a protocol of delivery and acceptance signed by both sides. The buyer's surveyor checks that what is handed over matches what was promised.
Newbuilding deliveries follow a different path. The owner's site team and a delivery surveyor accept the ship from the yard after trials, and final inspection focuses on punch-list items, outstanding class and flag items, and the guarantee regime. On both kinds, the surveyor is working to a checklist built around the contract.
Typical tasks include confirming class status and certificate validity with the society, checking that any conditions of class imposed before the sale have been dealt with, and comparing the vessel against the condition at the previous inspection. Quantities of bunkers and lubricants are measured by soundings, with density and temperature, because these are normally paid for in addition to the price. Provisions, spare parts, stores, charts and publications, and the ship's documents and records are inventoried. Damage that has arisen since the earlier inspection is photographed and noted.
Ask a prospective surveyor whether they will be on board throughout the handover, whether they can check underwater condition through a diver's report where the contract provides for one, and whether they can attend at short notice in a remote port.
The deliverables are a handover report with quantity calculations, a photographic record, a list of deficiencies at the time of delivery, and, if applicable, notes for a letter of reservation to the seller.
Typical issues are lower-than-agreed fuel quantities, missing spare parts, certificates close to expiry, and unreported damage since the inspection.